Moody Bedell Covered Bridge, Grafton County, New Hampshire
This bridge no longer stands.
Photograph: Denimadept
The first bridge at this site was an open structure built in 1805. In 1821, it was rebuilt and stood until 1841. In 1851, another open bridge was constructed and stood until 1862. A middle pier was added and the covered bridge was built in 1863.
- County
- Grafton
- State
- New Hampshire
- Crosses
- Connecticut River
- Built
- 1805
- Length
- 382'
- Spans
- 2
- World Guide Number
- 29-05-12x
This page needs JavaScript to show the interactive map.
All covered bridges.